[-] Show simple item record

dc.contributor.advisorO'Connell, Robert M., 1949-eng
dc.contributor.authorHong, Wei, 1983-eng
dc.date.issued2009eng
dc.date.submitted2009 Falleng
dc.descriptionTitle from PDF of title page (University of Missouri--Columbia, viewed on March 10, 2010).eng
dc.descriptionThe entire thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file; a non-technical public abstract appears in the public.pdf file.eng
dc.descriptionThesis advisor: Dr. Robert M O'Connell.eng
dc.descriptionM.S. University of Missouri--Columbia 2009.eng
dc.description.abstract[ACCESS RESTRICTED TO THE UNIVERSITY OF MISSOURI AT REQUEST OF AUTHOR.] In electric utility, overcurrent and overvoltage transients in switching operations often cause severe damage on the power system equipments. In this study, Alternative Transients Program -Electromagnetic Transients Program (ATP-EMTP) was employed for a general utility system modeling. A certain 161 kV: 34.5 kV Ameren UE substation in the Potosi area was discussed. The system consisting of the generators, the transformers, the switches, a circuit breaker, a capacitor bank, a fuse holder, the transmission lines, the cables and the loads is modeled by means of provided measured data. Some non-ideal components are modeled and explained in detail in order to explain some possible complex transient behavior including inrush current, harmonic resonance, ferroresonance, reignition of the circuit breaker and other high frequency resonance effects. In the particular system, failure of a 4.5 MVAR capacitor bank happened due to an improper switching operation. The simulation results for the capacitor bank phase currents and voltages suggest that excessive switching transients due to inrush current, associated with energizing an idle transformer; oscillatory transients involving the transformer and cable parasitic capacitances upon closure of the circuit breaker; and reignition associated with a wrong circuit breaker closing followed by the opening command by protections may play a role in the failure of the fuse holder and capacitor bank.eng
dc.description.bibrefIncludes bibliographical references.eng
dc.format.extentx, 56 pageseng
dc.identifier.oclc558824382eng
dc.identifier.urihttps://hdl.handle.net/10355/6652
dc.identifier.urihttps://doi.org/10.32469/10355/6652eng
dc.languageEnglisheng
dc.publisherUniversity of Missouri--Columbiaeng
dc.relation.ispartofcommunityUniversity of Missouri-Columbia. Graduate School. Theses and Dissertations. Theses. 2009 Theseseng
dc.rightsAccess is limited to the campuses of the University of Missouri.eng
dc.subject.lcshTransients (Electricity)eng
dc.subject.lcshCapacitor bankseng
dc.subject.lcshSwitching circuitseng
dc.subject.lcshSystem failures (Engineering)eng
dc.titleAn ATP/EMTP model for the study of both normal and abnormal substation equipment operationeng
dc.typeThesiseng
thesis.degree.disciplineElectrical and computer engineering (MU)eng
thesis.degree.grantorUniversity of Missouri--Columbiaeng
thesis.degree.levelMasterseng
thesis.degree.nameM.S.eng


Files in this item

[PDF]
[PDF]
[PDF]

This item appears in the following Collection(s)

[-] Show simple item record